Westin Boathouse, Fiji – Case study

Project Overview The Westin Boathouse project required a structurally expressive, architecturally refined timber solution that would celebrate its waterfront setting while meeting modern performance, sustainability, and durability expectations. A key feature of the design was its sweeping roof form and ribbed structural shell, elements that relied heavily on the precision and capability of advanced timber [...]

By |2025-11-27T13:57:20+13:00November 25th, 2025|News|0 Comments

Next Generation Mass Timber Solutions | WoodStock

Thank you to everyone who registered for our recent event on mass timber construction. These sessions are designed to educate architects, engineers, developers, and builders on the efficient, state-of-the-art use of mass timber.For those who couldn’t attend, here’s a summary of the key takeaways from our expert speakers: Introducing Timberlab 2.0 Timberlab 2.0 is our new [...]

By |2025-11-07T18:43:08+13:00October 24th, 2025|News|0 Comments

AUT A1 – Case Study

Project Overview AUT sought to create a new flagship building - Tukutuku, at its North Campus in Auckland. The goal was to deliver a sustainable, culturally integrated, and future-focused learning environment that would serve as the social and academic heart of the campus. The project needed to meet ambitious embodied carbon targets, integrate Māori cultural narratives, and [...]

By |2025-09-26T09:15:17+12:00September 26th, 2025|News|0 Comments

Digital Fabrication and DfMA | WoodStock

Thank you to everyone who registered for our recent event on mass timber construction. These sessions are designed to educate architects, engineers, developers, and builders on the efficient, state-of-the-art use of mass timber.For those who couldn’t attend, here’s a summary of the key takeaways from our expert speakers: Red Stag TimberLab – Background & Sustainability Andrew [...]

By |2025-11-10T20:59:17+13:00July 25th, 2025|News|0 Comments

West Gate Tunnel Project (Eel Nets) – Case Study

West Gate Tunnel Project - Eel Nets As part of the transformative West Gate Tunnel Project in Melbourne, the Eel Nets portal structures are architectural markers that signify key entry and exit points of the new road tunnels. These large-scale glulam constructions act as both sculptural landmarks and transitional light filters, easing driver adjustment to [...]

By |2025-10-28T14:25:32+13:00July 24th, 2025|News|0 Comments

Katara Bridge – Case Study

92m Span Timber Bridge Red Stag TimberLab (RSTL) was engaged to design, manufacture and deliver the structural timber components for a striking 92-metre span glulam bridge; commissioned by the local authority in Doha, Qatar. The structural engineering design and detailed construction drawings were completed by Enovate Consultants, who also coordinated with local engineers to design [...]

By |2025-11-10T19:24:38+13:00June 17th, 2025|News|0 Comments

Mass Timber Structural Flooring | WoodStock

Thank you to everyone who registered for our recent event on mass timber construction. For those who couldn’t attend, here’s a summary of the key takeaways from our expert speakers: Red Stag TimberLab – Product Innovation & Sustainability Sam Leslie presented a deep dive into Red Stag TimberLab’s operations, products, and commitment to sustainable, digital-first [...]

By |2025-05-27T08:19:19+12:00May 26th, 2025|News|0 Comments

Continuous Digital Chain in Construction

Major hybrid timber structures come with complexity — and with complexity comes risk. Without a robust digital process, delays, rework, and coordination issues can quickly escalate on site. This video highlights how a DfMA (Design for Manufacture and Assembly) approach, combined with a continuous digital workflow from design to installation, can reduce risk, save time, [...]

By |2025-11-10T14:40:33+13:00May 20th, 2025|News|0 Comments

Waipawa Substation | Project Case Study

Delivering Resilient Infrastructure with Precision and Speed The Waipawa Substation project required a robust construction solution that could withstand the demands of essential infrastructure while overcoming the logistical challenges of a remote location. Efficient material transport, rapid installation, and structural integrity were critical to ensuring a successful build within a tight timeframe. Red Stag TimberLab's [...]

By |2025-11-10T15:17:39+13:00April 11th, 2025|News|0 Comments

Korora Road | Project Case Study

*Image taken prior to application of Exterior Claddings. Interior images not available at client's request. Seamless Efficiency in a Stunning Natural Setting Nestled in a stunning natural setting, the project site presented several challenges. Limited accessibility made transporting and assembling construction materials difficult, requiring innovative solutions to ensure a smooth and efficient build. Additionally, the [...]

By |2025-08-21T13:34:57+12:00February 20th, 2025|News|0 Comments

90 Devonport Road | CLT Project Case Study

The Challenge The 90 Devonport Road project represented a significant opportunity and challenge: constructing New Zealand’s largest mass timber office building while meeting sustainability, efficiency, quality, and carbon reduction targets. With an eight-story structure primarily featuring Cross-Laminated Timber (CLT), the project had high expectations for precision, timely delivery, and environmental leadership. Ensuring a seamless integration [...]

By |2025-02-19T11:14:15+13:00October 16th, 2024|News|0 Comments

B201 | The University of Auckland – Case Study

New Zealand's Highest Green Star Rated Building The B201 redevelopment represents an industry-leading example of sustainable construction, by incorporating the adaptive reuse of an existing structure, refurbished with carefully selected low-carbon materials, to achieve New Zealand’s highest Green Star rated building.Red Stag TimberLab was engaged in manufacturing the large-scale Glulam structure that forms the roof [...]

By |2024-11-25T10:22:50+13:00September 20th, 2024|News|0 Comments

Living Pā Case Study

Credit: Illustration by www.stantiallstudio.co.nz Project Credits Client: Te Herenga Waka - Victoria University of Wellington | Builder: LT McGuinness | Architect: Tennent Brown Architects | Structural Engineer: Dunning Thornton Consultants | Product: CLT & Glulam Tōia mai rā ngā waka i te au a Tāne ki ngā waikarekare, pareārohirohi o Te Whanganui a Tara. Kia ū [...]

By |2025-08-20T08:25:09+12:00July 19th, 2024|News|0 Comments

Court Theatre Case Study

Project Credits Client: Christchurch City Council | Main Contractor: Hawkins Construction | Architect: Haworth Tompkins & Athfield Architects | Engineer: Ruamoko Solutions | Mass timber installer: Kobe Construction | Mass timber BIM Co-ordinator: Offsite Design | Product: CLT, LVL, Glulam Court Theatre Overview Red Stag TimberLab proudly supplied all mass timber components for the construction of the [...]

By |2025-11-10T19:45:31+13:00June 21st, 2024|News|0 Comments

NZIA Awards 2024 Winning Projects | Red Stag TimberLab

Congratulations to all winners and shortlisted projects in the NZIA Awards 2024! 🎉🌟 Red Stag TimberLab is proud to have supplied our premium timber products to several award-winning and highly commended projects recognized in the NZIA Awards. Congratulations to all the talented architects and partners involved! Waikato BOP Rototuna Library - A hub of knowledge [...]

By |2024-11-25T10:00:13+13:00May 30th, 2024|News|0 Comments

63 Tasman Road | CLT Project Case Study

CLT Project Credits Architect: APG Architects | Engineer: Design Station | Installer: Woodtek | Products: CLT A Minimalist Touch of Class at 63 Tasman Road The 63 Tasman Road project aimed to integrate innovative mass timber solutions for structural performance, functionality, and aesthetic appeal. Red Stag TimberLab Limited, the chosen mass timber supplier, played a crucial [...]

By |2024-04-26T08:12:03+12:00April 26th, 2024|News|0 Comments

Farewell Darren | A Tribute from Red Stag TimberLab

Farewell to a Remarkable Leader: A Tribute from Red Stag TimberLab The Red Stag TimberLab team bids farewell to one of our esteemed leaders here at Red Stag TimberLab. His departure from our company marks the end of a significant chapter, one that has been marked by his exemplary leadership and unwavering commitment to our [...]

By |2025-11-07T18:51:47+13:00April 4th, 2024|News|0 Comments

Dolomite Point Case Study

Project Credits Client: Department of Conservation (DOC) | Architect: Sheppard & Rout | Engineer: Lewis Bradford | Contract Manager: RCP | Contractor: Naylor Love Dolomite Point Overview The new redevelopment at Dolomite Point in Punakaiki on the South Island’s West Coast is nearing completion. It encompasses a new visitor Experience Centre and Exhibition Space to [...]

By |2025-11-10T15:51:29+13:00March 26th, 2024|News|0 Comments

Advanced CNC Machines for Timber Processing

Advanced CNC Machines for Timber Processing CNC machines have revolutionized the manufacturing industry with their unparalleled precision, speed, and versatility. Red Stag TimberLab has invested heavily in CNC technology in the last decade and now operates 5 x CNC machines.These cutting-edge systems pushed the boundaries of what is possible in timber processing, delivering exceptional results [...]

By |2024-11-25T09:50:57+13:00March 12th, 2024|News|0 Comments

Aurecon Stairs Case Study – CLT and Glulam

Project Credits Architect: Warren & Mahoney | Structural Engineer: Aurecon Group | Builder: Savory Interiors | Installer: Kobe Construction | Products: CLT and Glulam Crafting Elegance: Timber Innovation for Interior Design Red Stag TimberLab supplied high-quality Cross-laminated timber (CLT) and Glulam for the stairwell in the new Aurecon Auckland office refurbishment. Glulam trusses run floor [...]

By |2024-07-30T07:39:41+12:00February 26th, 2024|News|0 Comments

Te Whare Nui o Tuteata | Scion Timber Innovation Hub Case Study

Project Credits Scion Research | Project Manager | QS: RDT Pacific | Architect: RTA Studio + Irving Smith Architects | Engineer: Dunning Thornton Consultants  Scion: A three-storey seismic resistant diagrid design, Rotorua, New Zealand Scion is a NZ Crown research institute that specialises in research, science and technology development for the forest, wood and wood-derived materials [...]

By |2024-11-25T09:48:46+13:00February 16th, 2024|News|0 Comments

Hayman Park Case Study – The Tallest Playground in NZ

Project Credits Client: Auckland Council; Eke Panuku | Project Manager: Bluwater Project Management | Architect: Athfield Architects and Wala Landscape + Architecture | Engineer: Enovate Consultants | Contractor: HEB Construction | Mass timber installert: Kobe Construction The Tallest Playground in New Zealand Red Stag TimberLab proudly participated in the new Hayman Park playground development in [...]

By |2024-11-25T09:46:23+13:00August 25th, 2023|News|0 Comments

Red Stag TimberLab | Celebrating 100 Years – A Legacy of Innovation and Dedication!

Celebrating 100 Years - A Legacy of Innovation and Dedication | Red Stag TimberLab Prologue: A Vision for Excellence In 1923, a visionary named Ian McIntosh founded I.R. McIntosh, a furniture manufacturing company that would lay the cornerstone for what we know today as Red Stag TimberLab. With a deep passion for woodworking and an [...]

By |2024-11-25T09:40:34+13:00August 21st, 2023|News|0 Comments
Go to Top